Tarpaulin removed!
We took off the tarpaulin, then removed the left over drying green waste. This exposed the gravel board edged sand paths, which are in a bad state of repair and need to be renewed. Some concrete edging was uncovered, which we will reclaim and reuse where possible.
5 large shrubs were removed, along with most of their route systems.